News & Events News News Archive Kingspan Not Shaken Nor Stirred By Tight Deadline
 
News
Latest News
News Archive
Customer Newsletter

Click Here to interact

 

Kingspan Not Shaken Nor Stirred By Tight Deadline
September 2007
Kingspan Not Shaken Nor Stirred By Tight Deadline
Kingspan Insulated Panels provides the building envelope for the new 007 Stage at Pinewood Studios.
 
When the Pinewood Studios 007 James Bond Stage was destroyed by fire in 2006 shortly after completion of filming for Casino Royale, the Studio had to act fast. With its next film project already booked to go, it was vital that the building of a new stage should be turned around in a mere six months from design to handover.
 
The construction team, led by Project Managers Jon Bradley, included Cladding Contractors SD Samuels, who knew exactly where to go for an effective fast-build solution. 
 
Samuels recommended Kingspan Insulated Panels for both the walls and roof of the new stage, which at 102m long, 48m wide and a height of 19m is Europe’s largest sound stage.
 
10,000m2 of Kingspan KS1000 RW Trapezoidal and KS1000 MR Micro-Rib Wall Panels were used to complete the building. Since the original stage burnt down a crucial attribute was fire performance, and fortunately for the future of the nation’s favourite spy, the panels have excellent fire resistance. Both systems provide insurer approved  solutions, with the assurance of LPCB certification to LPS 1181 and FM approval, and are defined as Class 0 under the Building Regulations.
 
Another key benefit is that Kingspan’s insulated roof and wall systems are factory pre-engineered, single component systems, which optimise build speeds and produce excellent results where time is an important factor in the specification. Having worked with Kingspan Insulated Panels on a number of projects, SD Samuels’ Wayne Mills was well aware of this fact. He said:
 
“It was essential for us to use a company that we knew and trusted. The deadline on this job was crucial and we knew from past experience that we could rely on efficient delivery and support from Kingspan and so, do a good job for our client.”
 
The new stage, which has an internal area of approx 59,000 sq ft including an immense water tank capable of holding 5.25 million litres, was completed on schedule in March 2007 and was immediately put to use for the film version of the stage musical Mamma Mia.  
 
For further information please contact:
 
Tel: 01352 717251


 
Free Literature
Click here to download - KS1000 LP Lo-Pitch & CR Curved Roof


Free Literature
Click here to download - Designers & Specifiers Guide for Insurer Approved Firesafe Roof, Wall & Ceiling Systems